{"id":12732,"date":"2026-11-12T12:03:34","date_gmt":"2026-11-12T12:03:34","guid":{"rendered":"https:\/\/kewlegal.com\/resources\/business-contract-and-vendor-dispute-attorney\/subcontractor-walked-off-condo-project-florida-developer\/"},"modified":"2026-11-12T12:03:47","modified_gmt":"2026-11-12T12:03:47","slug":"subcontractor-walked-off-condo-project-florida-developer","status":"publish","type":"page","link":"https:\/\/kewlegal.com\/resources\/business-contract-and-vendor-dispute-attorney\/subcontractor-walked-off-condo-project-florida-developer\/","title":{"rendered":"Subcontractor Walked Off a Florida Project: First Steps"},"content":{"rendered":"\n<div class=\"wp-block-cover alignfull is-dark chg-hero\" style=\"min-height:460px;aspect-ratio:unset;\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-background-dim-70 has-background-dim wp-block-cover__gradient-background has-background-gradient\" style=\"background:linear-gradient(90deg,rgba(32,36,46,1) 0%,rgba(32,36,46,1) 55%,rgba(32,36,46,0.7) 100%)\"><\/span><img class=\"wp-block-cover__image-background wp-image-12730\" alt=\"A construction site in Florida with unfinished concrete framing, scattered tools, and a partially built structure under a clear sky.\" src=\"https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/11\/a-construction-site-in-florida-with-unfinished-concrete-fram-photo.jpg\" width=\"1376\" height=\"768\" srcset=\"https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/11\/a-construction-site-in-florida-with-unfinished-concrete-fram-photo-150x150.jpg 150w, https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/11\/a-construction-site-in-florida-with-unfinished-concrete-fram-photo-300x167.jpg 300w, https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/11\/a-construction-site-in-florida-with-unfinished-concrete-fram-photo-768x429.jpg 768w, https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/11\/a-construction-site-in-florida-with-unfinished-concrete-fram-photo-1024x572.jpg 1024w, https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/11\/a-construction-site-in-florida-with-unfinished-concrete-fram-photo.jpg 1376w\" sizes=\"(max-width: 825px) 825px, 100vw\" fetchpriority=\"high\" decoding=\"async\"\/><div class=\"wp-block-cover__inner-container has-global-padding is-layout-constrained wp-block-cover-is-layout-constrained\">\n<p class=\"chg-eyebrow has-base-color has-text-color wp-block-paragraph\" style=\"text-shadow:0 1px 3px rgba(0,0,0,0.6),0 0 18px rgba(0,0,0,0.35)\">Business Contract Disputes | Coral Gables and Miami-Dade<\/p><h1 class=\"wp-block-heading has-base-color has-text-color\" style=\"text-shadow:0 1px 3px rgba(0,0,0,0.6),0 0 18px rgba(0,0,0,0.35)\">Your Subcontractor Walked Off the Job. What to Do in the First Days<\/h1><p class=\"has-base-color has-text-color wp-block-paragraph\" style=\"font-size:clamp(0.875rem, 0.875rem + ((1vw - 0.2rem) * 0.625), 1.25rem);text-shadow:0 1px 3px rgba(0,0,0,0.6),0 0 18px rgba(0,0,0,0.35)\">Quick, deliberate moves at the start can keep a site dispute from spreading to your schedule, your budget, and your other vendors.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+13059902300\">Schedule a Free First Consultation<\/a><\/div><div class=\"wp-block-button chg-cta chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/kewlegal.com\/contact-us\/\">Schedule a Free First Consultation<\/a><\/div><\/div>\n<\/div><\/div>\n\n\n<p class=\"wp-block-paragraph\" style=\"font-size:0.85rem;color:#6b7280;margin-bottom:1.5rem\">By Kristina E. Wilson \u00b7 Published November 12, 2026<\/p>\n\n<article lang=\"en\">\n\n\n<p>When a subcontractor walks off your Florida condo job, the schedule, the lender and your family&#8217;s trust can all feel at risk at once. The short answer: protect the facts first, read the subcontract next, check lien and notice deadlines, and only then decide how to replace the work and whether to press a claim.<\/p>\n<p>The right sequence still depends on the facts of your project.<\/p>\n<h2>The first days after a subcontractor leaves set the record you&#8217;ll rely on<\/h2>\n<p>The first days after a subcontractor leaves set the facts that matter later. Your job now is to limit the damage and build a clean record, not to win the argument.<\/p>\n<p>Picture a common version of this. A sub stops work on an amenity floor with weeks left before turnover. Your lender wants updates, buyers want delivery dates, and family partners want to know what comes next.<\/p>\n<p>Three things matter most at this stage. Record what happened while it&#8217;s fresh. Find the contract terms that set each side&#8217;s next step. Track the clocks, because some deadlines start early.<\/p>\n<p>Florida Statute <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.11.html\">\u00a7 95.11<\/a> sets different limitations periods depending on the type of action. For example, under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.11.html\">Fla. Stat. \u00a7 95.11<\/a>, an action founded on negligence shall be commenced within two years, and a legal or equitable action on a contract, obligation, or liability founded on a written instrument shall be commenced within five years. The section also includes exceptions and conditions that apply to particular actions, such as an action to enforce a claim against a payment bond. <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.11.html\">Read Fla. Stat. \u00a7 95.11<\/a> Under subsection (3)(b), an action founded on the design, planning, or construction of an improvement to real property generally must be brought within four years, counted from the earliest of these dates: when the authority having jurisdiction issues a temporary certificate of occupancy, a certificate of occupancy, or a certificate of completion, or when construction is abandoned if not completed. If the action involves a latent defect, the four years instead run from when the defect is discovered or should have been discovered with the exercise of due diligence, but in any event the action must be commenced within 7 years after that earliest date.<\/p>\n\n<div class=\"cta-dose-mid wp-block-group has-contrast-color has-surface-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-32197852 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--surface,#f2f3f5);color:var(--wp--preset--color--contrast,#22252b);border-radius:8px;padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem;border-left:6px solid var(--wp--preset--color--cta,currentColor);box-shadow:0 2px 10px rgba(0,0,0,0.18)\">\n<p class=\"wp-block-paragraph\">If a subcontractor has walked off your project with closings on the calendar, our team can talk through the contract and your next steps with you. Talk it through with our team &#8212; the first consultation is free, confidential, and carries no obligation.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+13059902300\">Get a free consultation<\/a><\/div><div class=\"wp-block-button chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/kewlegal.com\/contact-us\/\">Get a free consultation<\/a><\/div><\/div>\n<\/div>\n\n<figure class=\"wp-block-image size-large has-custom-border\"><img src=\"https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/10\/two-construction-workers-in-hard-hats-help-each-other-on-a-b-photo.jpg\" alt=\"Two construction workers in hard hats help each other at a building site.\" style=\"border-radius:8px;width:100%;aspect-ratio:16\/9;object-fit:cover\" class=\"wp-image-2498\" width=\"1600\" height=\"1066\" srcset=\"https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/10\/two-construction-workers-in-hard-hats-help-each-other-on-a-b-photo-150x150.jpg 150w, https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/10\/two-construction-workers-in-hard-hats-help-each-other-on-a-b-photo-300x200.jpg 300w, https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/10\/two-construction-workers-in-hard-hats-help-each-other-on-a-b-photo-768x512.jpg 768w, https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/10\/two-construction-workers-in-hard-hats-help-each-other-on-a-b-photo-1024x682.jpg 1024w, https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/10\/two-construction-workers-in-hard-hats-help-each-other-on-a-b-photo-1536x1023.jpg 1536w, https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/10\/two-construction-workers-in-hard-hats-help-each-other-on-a-b-photo.jpg 1600w\" sizes=\"auto, (max-width: 760px) 100vw, 760px\" loading=\"lazy\" decoding=\"async\"\/><\/figure>\n<h2>Stop, document, and pull the complete paper trail<\/h2>\n<p>Gather every record that shows what was agreed, what was paid and what was left undone.<\/p>\n<ul>\n<li>The subcontract, its scope, approved change orders and the approved schedule.<\/li>\n<li>Pay applications, invoices and proof of every payment you made.<\/li>\n<li>Daily logs, site photos, inspection reports, and texts or emails showing when and why the sub stopped.<\/li>\n<li>A written list of what is complete, partly complete or defective, plus any materials or equipment the sub left on site or still holds.<\/li>\n<\/ul>\n<p>Keep originals and back up everything off the site. Lenders, buyers, a replacement contractor and a court or arbitrator may each ask for the same records. Don&#8217;t rebuild old records from memory later. If you must add something, write a dated note that says so.<\/p>\n<p>Ask one question as you collect: could someone who wasn&#8217;t on site follow what happened?<\/p>\n<h2>Read the subcontract&#8217;s default, notice and dispute clauses before you act<\/h2>\n<p>When a subcontractor walked off a developer contract in Florida, the subcontract decides what counts as a default and how you must give notice.<\/p>\n<p>Start with the parties. Check whether the sub signed as an individual or through an operating company. A notice sent to the wrong entity may not reach the party you need to reach.<\/p>\n<ul>\n<li>Default definitions, written notice rules, cure periods and termination steps.<\/li>\n<li>Any dispute clause, such as mediation, arbitration or a named venue.<\/li>\n<li>Attorney&#8217;s fee and interest terms.<\/li>\n<\/ul>\n<p>If the contract requires arbitration, Florida&#8217;s <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0600-0699\/0682\/Sections\/0682.02.html\">arbitration statute<\/a> treats that agreement as valid and enforceable. Under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0600-0699\/0682\/Sections\/0682.02.html\">Fla. Stat. \u00a7 682.02<\/a>, an agreement contained in a record to submit to arbitration any existing or subsequent controversy arising between the parties to the agreement is &#8220;valid, enforceable, and irrevocable except upon a ground that exists at law or in equity for the revocation of a contract.&#8221; The court decides whether an agreement to arbitrate exists or whether a controversy is subject to it.<\/p>\n<p>Florida&#8217;s <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0047\/Sections\/0047.011.html\">venue statute<\/a> says actions must be brought only in the county where the defendant resides, where the cause of action accrued, or where the property in litigation is located, and it does not apply to actions against nonresidents. On a Miami-Dade project, that last point can matter.<\/p>\n<p>Under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0600-0699\/0605\/Sections\/0605.0117.html\">Florida&#8217;s LLC notice statute<\/a>, a notice or demand made under Florida&#8217;s LLC chapter may go to a member of a member-managed LLC or a manager of a manager-managed LLC, to the registered agent at its Florida registered office, or to a Florida address that is in fact its principal office; the section does not affect the right to give notice or make a demand in any other manner provided by law. The <a href=\"https:\/\/dos.fl.gov\/sunbiz\/\">Division of Corporations<\/a> is the official source for Florida entity registration and status requirements.<\/p>\n<p>For the wider picture, read about our <a href=\"\/resources\/business-contract-and-vendor-dispute-attorney\/\">business contract and vendor dispute work<\/a>.<\/p>\n<h2>Protect lien rights and notice deadlines under Florida&#8217;s construction lien law<\/h2>\n<p>Missing one can narrow your options.<\/p>\n<p>Those dates come from your project&#8217;s own records. A calendar built early works better than one built during a dispute. Ask counsel to map every lien-related step as soon as the sub leaves.<\/p>\n<ul>\n<li>Unpaid suppliers and workers can create claims against the property, so the sub&#8217;s payment status matters to you.<\/li>\n<li>Check every lien waiver against what was actually paid. A waiver that doesn&#8217;t match the money leaves gaps.<\/li>\n<li>Review what is still owed down the chain to suppliers before you release final amounts.<\/li>\n<\/ul>\n<p>Developers under schedule pressure often release a draw to keep work moving. That shortcut deserves a second look before any money leaves the account.<\/p>\n<h2>Replace the work without creating new exposure<\/h2>\n<p>Replace the work only under written authority, with clear scope and a record for every added cost.<\/p>\n<ul>\n<li>Check how the subcontract handles replacement work, backcharges and change orders before a new contractor starts.<\/li>\n<li>Record the cost and schedule impact so any increase traces to the walk-off, not to new scope.<\/li>\n<li>Tell lenders, the condo association and unit buyers in writing, sharing only what each needs for closings.<\/li>\n<li>Match the replacement contract to the project documents for scope, warranties and payment terms.<\/li>\n<\/ul>\n<p>Be careful with backcharges you can&#8217;t yet support with records. A charge that outruns the paperwork invites a fight you didn&#8217;t need.<\/p>\n<h2>Keep communications written, limited, and discreet<\/h2>\n<p>Keep one point of contact and put every formal message in writing.<\/p>\n<ul>\n<li>Name one person on your side to speak for the project, so statements to the sub, buyers and the press don&#8217;t conflict.<\/li>\n<li>Avoid texts that assign blame, admit delay or guess about the sub&#8217;s finances. Those messages can become evidence.<\/li>\n<li>Florida&#8217;s <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0090\/Sections\/0090.502.html\">lawyer-client privilege statute<\/a> protects confidential communications, meaning those not meant for outsiders, but the section lists exceptions, including when services were sought to aid a crime or fraud the client knew about, and communications made to a lawyer consulted in common by two or more clients when offered in a later civil action between them. Share legal advice only with people who need it for the work.<\/li>\n<\/ul>\n<p>If the dispute reaches mediation, <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0044\/Sections\/0044.405.html\">Florida&#8217;s mediation confidentiality statute<\/a> makes mediation communications confidential. A signed written settlement is not confidential unless the parties agree otherwise. Florida&#8217;s <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0044\/Sections\/0044.102.html\">court-ordered mediation rules<\/a> require a court, on one party&#8217;s request, to refer a filed civil action for money damages to mediation, if that party can pay the costs or they can be equitably divided between the parties, unless an exception applies. Plan your wording with that in mind.<\/p>\n\n<div class=\"cta-dose-mid wp-block-group has-contrast-color has-surface-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-32197852 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--surface,#f2f3f5);color:var(--wp--preset--color--contrast,#22252b);border-radius:8px;padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem;border-left:6px solid var(--wp--preset--color--cta,currentColor);box-shadow:0 2px 10px rgba(0,0,0,0.18)\">\n<h3 class=\"wp-block-heading has-contrast-color has-text-color\">Not sure what your next step is?<\/h3><p class=\"wp-block-paragraph\">Talk it through with our team &#8212; the first consultation is free, confidential, and carries no obligation.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+13059902300\">Get a free consultation<\/a><\/div><div class=\"wp-block-button chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/kewlegal.com\/contact-us\/\">Get a free consultation<\/a><\/div><\/div>\n<\/div>\n<h2>Common missteps that weaken a developer&#8217;s position<\/h2>\n<p>The most common missteps are acting before the contract&#8217;s steps are complete and writing admissions before the facts are clear.<\/p>\n<ul>\n<li>Terminating the sub or withholding payment without following the subcontract&#8217;s notice and cure steps.<\/li>\n<li>Paying final amounts without lien waivers or without checking what suppliers are still owed.<\/li>\n<li>Letting replacement work start before scope, backcharges and records are settled.<\/li>\n<li>Waiting until a deadline is close before asking counsel to review the file.<\/li>\n<\/ul>\n<p>Waiting can also cost you rights. Under a general Florida rule, a party that fails to act on its right to end a voidable contract, after learning the facts, can be found to have ratified it. The <a href=\"https:\/\/flcourts-media.flcourts.gov\/content\/download\/283961\/opinion\/Opinion_12-3192.pdf\">Flaherty ruling<\/a> explains that ratification occurs when a party entitled to rescind a voidable contract fails to do so after the discovery of facts that warrant a rescission.<\/p>\n<p>Florida law also lets a court shift attorney&#8217;s fees onto a losing party and its lawyer. That can happen when a claim or defense was not supported by the facts or the law, and the side knew or should have known it. Weak positions carry cost risk on both sides, under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0057\/Sections\/0057.105.html\">Florida&#8217;s fee and sanctions statute<\/a>.<\/p>\n<details class=\"wp-block-details chg-faq is-layout-flow wp-block-details-is-layout-flow\"><summary>Can I withhold payment from a subcontractor who walked off?<\/summary><p>Not before you check the subcontract&#8217;s notice and cure steps. Withholding without following them can create its own dispute.<\/p><\/details><details class=\"wp-block-details chg-faq is-layout-flow wp-block-details-is-layout-flow\"><summary>Can a subcontract&#8217;s arbitration clause force the dispute out of court?<\/summary><p>Yes, if the agreement is valid and enforceable under Florida&#8217;s arbitration statute.<\/p><\/details><details class=\"wp-block-details chg-faq is-layout-flow wp-block-details-is-layout-flow\"><summary>How long do I have to sue?<\/summary><p>The period depends on the claim and the event that starts it. Florida&#8217;s <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.11.html\">limitations statute<\/a> sets different periods for different claims, so check yours early.<\/p><\/details>\n\n<figure class=\"wp-block-image size-large has-custom-border\"><img src=\"https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/11\/two-workers-in-hard-hats-help-an-injured-colleague-at-a-cons-photo.jpg\" alt=\"Two workers in hard hats help an injured colleague at a construction site.\" style=\"border-radius:8px;width:100%;aspect-ratio:16\/9;object-fit:cover\" class=\"wp-image-12731\" width=\"1600\" height=\"1066\" srcset=\"https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/11\/two-workers-in-hard-hats-help-an-injured-colleague-at-a-cons-photo-150x150.jpg 150w, https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/11\/two-workers-in-hard-hats-help-an-injured-colleague-at-a-cons-photo-300x200.jpg 300w, https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/11\/two-workers-in-hard-hats-help-an-injured-colleague-at-a-cons-photo-768x512.jpg 768w, https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/11\/two-workers-in-hard-hats-help-an-injured-colleague-at-a-cons-photo-1024x682.jpg 1024w, https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/11\/two-workers-in-hard-hats-help-an-injured-colleague-at-a-cons-photo-1536x1023.jpg 1536w, https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/11\/two-workers-in-hard-hats-help-an-injured-colleague-at-a-cons-photo.jpg 1600w\" sizes=\"auto, (max-width: 760px) 100vw, 760px\" loading=\"lazy\" decoding=\"async\"\/><\/figure>\n<h2>Talk through your project with KEW Legal<\/h2>\n<p>If your project is stalled and closings are on the calendar, you don&#8217;t have to sort out the subcontract, the notices and the lien timing alone.<\/p>\n<p>KEW Legal is a Florida business law firm with offices in Coral Gables and Sunny Isles Beach. It acts as outside general counsel for business owners and investors across Miami-Dade and South Florida. Kristina E. Wilson, one of the firm&#8217;s lawyers, is responsible for this page.<\/p>\n<p>A family developer with several projects often needs help taking contract and lien questions off in-house counsel&#8217;s desk. We can review your subcontract, notices and next steps with you, without promising any result.<\/p>\n<p>Call 305-990-2300 or <a href=\"https:\/\/kewlegal.com\/contact-us\/\">send us a message<\/a>. Your first consultation is free, confidential, and without obligation to continue.<\/p>\n\n<\/article>\n<footer class=\"disclaimer\"><em>The engagement of a lawyer is an important decision that should not be based solely upon advertisements. The information on this website is general information about KEW Legal and the services we offer; it does not constitute legal advice and is intended for informational purposes only. Accessing this website or contacting our firm does not establish an attorney-client relationship. KEW Legal, 16690 Collins Ave Ste 1101, Sunny Isles Beach, FL 33160.<\/em><\/footer>\n\n\n<div class=\"wp-block-group alignwide has-global-padding is-layout-constrained wp-container-core-group-is-layout-583d630a wp-block-group-is-layout-constrained\" style=\"padding-top:3rem;padding-bottom:3rem;padding-left:1.5rem;padding-right:1.5rem\">\n<h2 class=\"wp-block-heading has-text-align-center\">How outside counsel can help<\/h2>\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-f56f613f wp-block-columns-is-layout-flex\"><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--document\"><\/span><\/p><h3 class=\"wp-block-heading\">Review the subcontract<\/h3><p class=\"wp-block-paragraph\">We read the notice, cure, default, and dispute terms together so your next move matches what the agreement actually says.<\/p><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--shield\"><\/span><\/p><h3 class=\"wp-block-heading\">Protect your position<\/h3><p class=\"wp-block-paragraph\">We help you respond in a way that avoids admissions and keeps your options open.<\/p><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--info\"><\/span><\/p><h3 class=\"wp-block-heading\">Organize the record<\/h3><p class=\"wp-block-paragraph\">We help you gather the contract, change orders, schedules, invoices, and messages into one clear file.<\/p><\/div><\/div>\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-f56f613f wp-block-columns-is-layout-flex\"><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--chat\"><\/span><\/p><h3 class=\"wp-block-heading\">Communicate deliberately<\/h3><p class=\"wp-block-paragraph\">We help you decide what to say to the subcontractor, your lender, and your own clients.<\/p><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--lightbulb\"><\/span><\/p><h3 class=\"wp-block-heading\">Plan the replacement work<\/h3><p class=\"wp-block-paragraph\">We help you think through bringing in a new contractor without creating new exposure.<\/p><\/div><\/div>\n\n<\/div>\n\n\n\n<div class=\"wp-block-group has-contrast-color has-surface-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-32197852 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--surface,#f2f3f5);color:var(--wp--preset--color--contrast,#22252b);border-radius:8px;padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem;border-left:6px solid var(--wp--preset--color--cta,currentColor);box-shadow:0 2px 10px rgba(0,0,0,0.18)\">\n<h3 class=\"wp-block-heading has-contrast-color has-text-color\">Don&#x27;t withhold payment on instinct<\/h3><p class=\"wp-block-paragraph\">Holding back money from a subcontractor without following the notice and cure steps in your subcontract can create a second dispute. Check those steps before you act.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+13059902300\">Call 305-990-2300 for a free first consultation<\/a><\/div><div class=\"wp-block-button chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/kewlegal.com\/contact-us\/\">Call 305-990-2300 for a free first consultation<\/a><\/div><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-group alignfull has-surface-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-583d630a wp-block-group-is-layout-constrained\" style=\"padding-top:3rem;padding-bottom:3rem;padding-left:1.5rem;padding-right:1.5rem\">\n<h2 class=\"wp-block-heading has-text-align-center\">Four first steps<\/h2>\n<div class=\"wp-block-columns alignwide is-layout-flex wp-container-core-columns-is-layout-f56f613f wp-block-columns-is-layout-flex\"><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-base-background-color has-background is-layout-flow wp-block-group-is-layout-flow\" style=\"border-radius:8px;box-shadow:0 4px 14px rgba(0,0,0,0.08);padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem\"><h3 class=\"wp-block-heading\">Read the subcontract first<\/h3><p class=\"wp-block-paragraph\">Find the scope, payment terms, notice requirements, default provisions, and any arbitration or dispute resolution clause before you contact the subcontractor.<\/p><\/div><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-base-background-color has-background is-layout-flow wp-block-group-is-layout-flow\" style=\"border-radius:8px;box-shadow:0 4px 14px rgba(0,0,0,0.08);padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem\"><h3 class=\"wp-block-heading\">Document the walk-off<\/h3><p class=\"wp-block-paragraph\">Write down the date, the work left undone, who was on site, and what was said. Keep copies of texts, emails, daily logs, and photos.<\/p><\/div><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-base-background-color has-background is-layout-flow wp-block-group-is-layout-flow\" style=\"border-radius:8px;box-shadow:0 4px 14px rgba(0,0,0,0.08);padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem\"><h3 class=\"wp-block-heading\">Hold off on withholding payment<\/h3><p class=\"wp-block-paragraph\">Pause on any payment decisions until you have confirmed the contract&#x27;s notice and cure steps and the amounts actually owed for completed work.<\/p><\/div><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-base-background-color has-background is-layout-flow wp-block-group-is-layout-flow\" style=\"border-radius:8px;box-shadow:0 4px 14px rgba(0,0,0,0.08);padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem\"><h3 class=\"wp-block-heading\">Line up the replacement<\/h3><p class=\"wp-block-paragraph\">Plan how the remaining work will be bid, scheduled, and inspected, and keep the replacement contract consistent with your rights under the original deal.<\/p><\/div><\/div><\/div>\n\n<\/div>\n\n\n\n<div class=\"wp-block-group alignfull has-base-color has-primary-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-4d466591 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--primary,#20242e);color:var(--wp--preset--color--base,#ffffff);padding-top:3rem;padding-bottom:3rem;padding-left:1.5rem;padding-right:1.5rem\">\n<h2 class=\"wp-block-heading has-text-align-center has-base-color has-text-color\">Talk through your project with KEW Legal in Coral Gables<\/h2>\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-0aa01211 wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+13059902300\">Schedule your free, confidential consultation or call 305-990-2300<\/a><\/div><div class=\"wp-block-button chg-cta chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/kewlegal.com\/contact-us\/\">Schedule your free, confidential consultation or call 305-990-2300<\/a><\/div><\/div>\n<\/div>\n\n<!-- chg:section-siblings -->\n<nav aria-label=\"More in this section\">\n<h2>More in this section<\/h2>\n<ul><li><a href=\"\/resources\/business-contract-and-vendor-dispute-attorney\/supplier-breach-of-warranty-attorney-florida\/\">Supplier Breach of Warranty Attorney in Florida: Defective Goods and Failed Deliveries<\/a><\/li><li><a href=\"\/resources\/business-contract-and-vendor-dispute-attorney\/supplier-price-increase-dispute-attorney-florida\/\">Supplier Price Increase Dispute Attorney in Florida<\/a><\/li><li><a href=\"\/resources\/business-contract-and-vendor-dispute-attorney\/supply-agreement-dispute-attorney-florida\/\">Supply Agreement and Distribution Contract Dispute Attorney in Florida<\/a><\/li><li><a href=\"\/resources\/business-contract-and-vendor-dispute-attorney\/terminate-business-service-contract-florida-attorney\/\">Terminating a Service Contract in Florida: Attorney for Business Owners Who Want Out<\/a><\/li><li><a href=\"\/resources\/business-contract-and-vendor-dispute-attorney\/vendor-agreement-drafting-attorney-miami-dade\/\">Vendor Agreement Drafting Attorney in Miami-Dade<\/a><\/li><\/ul>\n<\/nav>\n<!-- \/chg:section-siblings -->","protected":false},"excerpt":{"rendered":"<p>Subcontractor walked off your Florida condo job? Learn the contract, notice and lien steps to take first. Free first consultation with KEW Legal.<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":311,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"chg_review":"","chg_sendback":"","chg_canonical":"","chg_lang":"","chg_hreflang":"[{\"hreflang\": \"en\", \"href\": \"https:\/\/kewlegal.com\/resources\/business-contract-and-vendor-dispute-attorney\/subcontractor-walked-off-condo-project-florida-developer\/\"}, {\"hreflang\": \"es\", \"href\": \"https:\/\/kewlegal.com\/resources\/es\/abogado-disputas-contratos-proveedores\/subcontratista-abandona-condominio-florida\/\"}, {\"hreflang\": \"x-default\", \"href\": \"https:\/\/kewlegal.com\/resources\/business-contract-and-vendor-dispute-attorney\/subcontractor-walked-off-condo-project-florida-developer\/\"}]","chg_jsonld":"[{\"about\": [{\"@type\": \"Thing\", \"name\": \"Limited liability company\", \"sameAs\": \"https:\/\/en.wikipedia.org\/wiki\/Limited_liability_company\"}, {\"@type\": \"Thing\", \"name\": \"Contract\", \"sameAs\": \"https:\/\/en.wikipedia.org\/wiki\/Contract\"}], \"author\": {\"@type\": \"Person\", \"name\": \"Kristina E. Wilson\", \"url\": \"https:\/\/kewlegal.com\/our-team\/kristina-e-wilson\/\", \"jobTitle\": \"Founder\", \"sameAs\": [\"https:\/\/www.floridabar.org\/directories\/find-mbr\/profile\/?num=71205\", \"https:\/\/www.linkedin.com\/in\/kristina-wilson-702b5410\/\", \"https:\/\/www.avvo.com\/attorneys\/33160-fl-kristina-wilson-3417246.html\"], \"worksFor\": {\"@type\": \"Organization\", \"@id\": \"https:\/\/kewlegal.com\/#organization\", \"name\": \"KEW Legal\", \"url\": \"https:\/\/kewlegal.com\/\"}}, \"@context\": \"https:\/\/schema.org\", \"audience\": {\"@type\": \"Audience\", \"audienceType\": \"Family-run condo developers managing construction projects, turnovers, and joint ventures\"}, \"headline\": \"Your Subcontractor Walked Off the Job. What to Do in the First Days\", \"mentions\": [{\"@type\": \"Thing\", \"name\": \"Fraud\", \"sameAs\": \"https:\/\/en.wikipedia.org\/wiki\/Fraud\"}, {\"@type\": \"Thing\", \"name\": \"Arbitration\", \"sameAs\": \"https:\/\/en.wikipedia.org\/wiki\/Arbitration\"}, {\"@type\": \"Thing\", \"name\": \"Mediation\", \"sameAs\": \"https:\/\/en.wikipedia.org\/wiki\/Mediation\"}, {\"@type\": \"Thing\", \"name\": \"Lawsuit\", \"sameAs\": \"https:\/\/en.wikipedia.org\/wiki\/Lawsuit\"}, {\"@type\": \"Thing\", \"name\": \"Damages\", \"sameAs\": \"https:\/\/en.wikipedia.org\/wiki\/Damages\"}, {\"@type\": \"Thing\", \"name\": \"Statute of limitations\", \"sameAs\": \"https:\/\/en.wikipedia.org\/wiki\/Statute_of_limitations\"}], \"provider\": {\"@type\": \"Organization\", \"@id\": \"https:\/\/kewlegal.com\/#organization\", \"name\": \"KEW Legal\", \"url\": \"https:\/\/kewlegal.com\/\"}, \"publisher\": {\"@type\": \"Organization\", \"@id\": \"https:\/\/kewlegal.com\/#organization\", \"name\": \"KEW Legal\", \"url\": \"https:\/\/kewlegal.com\/\"}, \"speakable\": {\"@type\": \"SpeakableSpecification\", \"cssSelector\": [\"article > p:first-of-type\", \".wp-block-details p\", \"article > h1\"]}, \"inLanguage\": \"en-US\", \"description\": \"A practical, ordered guide for a family-run Miami-Dade condo developer on what to document, which subcontract clauses to read, which Florida lien and notice deadlines to check, and how to replace subcontracted work and communicate in writing after a subcontractor stops work mid-project.\", \"spatialCoverage\": {\"name\": \"Miami-Dade County, Florida\", \"@type\": \"Place\"}, \"reviewedBy\": {\"@type\": \"Person\", \"name\": \"Natalie Martinez\", \"jobTitle\": \"Associate Attorney\", \"sameAs\": [\"https:\/\/www.floridabar.org\/directories\/find-mbr\/profile\/?num=1003311\"], \"worksFor\": {\"@type\": \"Organization\", \"@id\": \"https:\/\/kewlegal.com\/#organization\", \"name\": \"KEW Legal\", \"url\": \"https:\/\/kewlegal.com\/\"}}, \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"Can I withhold payment from a subcontractor who walked off?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Not before you check the subcontract's notice and cure steps. Withholding without following them can create its own dispute.\"}}, {\"@type\": \"Question\", \"name\": \"Can a subcontract's arbitration clause force the dispute out of court?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Yes, if the agreement is valid and enforceable under Florida's arbitration statute.\"}}, {\"@type\": \"Question\", \"name\": \"How long do I have to sue?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"The period depends on the claim and the event that starts it. Florida's limitations statute sets different periods for different claims, so check yours early.\"}}], \"@type\": [\"Article\", \"FAQPage\"], \"image\": \"https:\/\/kewlegal.com\/resources\/wp-content\/uploads\/2026\/11\/a-construction-site-in-florida-with-unfinished-concrete-fram-photo.jpg\"}, {\"@context\": \"https:\/\/schema.org\", \"@type\": \"BreadcrumbList\", \"itemListElement\": [{\"@type\": \"ListItem\", \"position\": 1, \"name\": \"Home\", \"item\": \"https:\/\/kewlegal.com\/resources\/\"}, {\"@type\": \"ListItem\", \"position\": 2, \"name\": \"Business Contract And Vendor Dispute Attorney\", \"item\": \"https:\/\/kewlegal.com\/resources\/business-contract-and-vendor-dispute-attorney\/\"}, {\"@type\": \"ListItem\", \"position\": 3, \"name\": \"Subcontractor Walked Off a Florida Project: First Steps\", \"item\": \"https:\/\/kewlegal.com\/resources\/business-contract-and-vendor-dispute-attorney\/subcontractor-walked-off-condo-project-florida-developer\/\"}]}]","chg_meta_description":"Subcontractor walked off your Florida condo job? Learn the contract, notice and lien steps to take first. Free first consultation with KEW Legal.","footnotes":""},"class_list":["post-12732","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/kewlegal.com\/resources\/wp-json\/wp\/v2\/pages\/12732","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kewlegal.com\/resources\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/kewlegal.com\/resources\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/kewlegal.com\/resources\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/kewlegal.com\/resources\/wp-json\/wp\/v2\/comments?post=12732"}],"version-history":[{"count":1,"href":"https:\/\/kewlegal.com\/resources\/wp-json\/wp\/v2\/pages\/12732\/revisions"}],"predecessor-version":[{"id":12734,"href":"https:\/\/kewlegal.com\/resources\/wp-json\/wp\/v2\/pages\/12732\/revisions\/12734"}],"up":[{"embeddable":true,"href":"https:\/\/kewlegal.com\/resources\/wp-json\/wp\/v2\/pages\/311"}],"wp:attachment":[{"href":"https:\/\/kewlegal.com\/resources\/wp-json\/wp\/v2\/media?parent=12732"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}